Company setup

Industrial licence and MODON in Saudi Arabia: who issues what for a factory

Updated 21 November 2026 · 12 min read

On this page
  1. Who does what in a factory project
  2. What the industrial licence is, and what it is not
  3. How MODON land works
  4. Ownership, capital and fees: what is official
  5. Customs relief and other incentives
  6. Documents from your home country
  7. Where Apex Arabia fits
  8. What to confirm before you commit to a factory
  9. Frequently asked questions
  10. Next step

A “MISA industrial license” in Saudi Arabia is, on the official pages we read, not one document from one body. MISA registers the foreign investor. The Ministry of Industry and Mineral Resources (MIMR) says on its own service page that it issues the industrial licence. MODON deals with land and ready-built factories in industrial cities. We could not confirm the exact order of these steps, so this guide shows what is official and what is not.

Key takeaways

  • Three bodies appear in a factory project: MISA (investment registration), MIMR (the industrial licence) and MODON (industrial land). Pages that say “MISA issues the industrial licence” or “MODON issues it” do not match the MIMR page we read.
  • The MIMR industrial licence is valid for one year at first and does not allow production to start. It is a stage licence, not the end of the process.
  • MISA’s Investor Guide gives no ownership percentage or minimum capital for industrial activities. Land rent, licence fees and incentives are mostly unconfirmed.
  • Apex Arabia has set up one company in the elevator industry. That is not general factory-licensing experience, and we are not an authority on which body issues each permit.

Reviewed by: the Apex Arabia team (no outside adviser is named; check anything that affects your tax or legal position with a licensed adviser) · Last reviewed: 21 November 2026

Who does what in a factory project

The table shows each body, what the official page says, and how sure we are. “Official” means we read it on a government page. “Not confirmed” means we saw it only in a search summary or on a consultancy page.

Step Body What we found Status
Investment registration of the foreign investor MISA Foreign companies register as investors with MISA. The fee is set by the Ministry when it approves the registration and is payable within 30 days (MISA Investor Guide, 13th edition, March 2026, section 5.1.2, pages 52-53). Official
Industrial licence Ministry of Industry and Mineral Resources (MIMR) The MIMR service page “Issuance of Industrial License” says the licence is issued by MIMR, is valid for one year, and does not allow the owner to start production. Page last modified 19 August 2025. Official
Industrial land or a ready factory MODON, applied for through the MIMR service page The MIMR page “(MODON) Industrial Site Allocation” lists the steps: request form, possible interview, allocation, financial claim, then a land lease contract. Page last modified 3 July 2026. Official (MIMR page only)
Environmental permit National Center for Environmental Compliance (NCEC) Reported in a search summary of a national-portal service page. We could not open the page. Not confirmed
Sector approvals Depends on the product (food, medicine and others) We saw that a food regulator publishes an investor journey for food manufacturing. We did not read it. Not confirmed

MISA’s own pages that we could read say nothing about industrial licences or MODON. MISA’s FAQ describes registration in general terms and does not say whether industrial activities need further approval. That is why we avoid the phrase “MISA licence” for the factory itself, even though it is how many people search.

What the industrial licence is, and what it is not

The MIMR page tells us three things. The licence is issued by MIMR. It is valid for one year. It does not entitle the owner to start production. The page gives a processing time of 30 to 90 days, and it does not mention fees or foreign investors. Its Conditions and Required Documents tabs did not load in our research tool, so we could not read the requirements.

Another MIMR portal page for the same service, which we read on 14 October 2026, gave a processing time of 48 hours. Two official pages disagree, and we cannot say which applies to a foreign investor or to which stage. Treat any single number as unconfirmed.

MIMR also lists renewal services for licences “in the establishment stage” and “in the construction stage”, each extending validity for up to five years when requirements are met. This suggests a staged licence. A search summary of a press release describes three stages (establishment, construction, production), but we could not read the release. Ask MIMR how the stages apply to your project (verify).

How MODON land works

MODON manages industrial cities. We could not read MODON’s own website because it returned a certificate error, so what follows comes from the MIMR page and from search summaries.

The MIMR page says you can apply for an industrial plot or a ready-built factory. After the request, the entity may call you for an interview. The product is allocated “based on eligibility and required approvals”. A financial claim is issued, and the lease contract follows once procedures are complete. The page gives no fee and does not say who the “relevant entity” is. It lists the audience as industrial entities and does not mention foreign investors.

What is not confirmed:

  • Lease length and payment terms. A search summary of a MODON page mentions up to 20 years and payment within 20 days of invoice (verify). The MIMR page says duration depends on the land provider.
  • Rent per square metre. No official figure found. Consultancy pages give wide, conflicting ranges, so we do not repeat them.
  • Whether you need the industrial licence before applying for land. A search summary of MODON’s services guide lists an industrial licence and a commercial register among the documents for a land lease (verify). The MIMR page does not say.
  • Which portal is current. The MIMR page uses its own portal, and a MODON page reportedly points to a separate one. Confirm with MIMR or MODON before you apply (verify).

Ownership, capital and fees: what is official

MISA’s Investor Guide has a table of activity types with minimum capital and Saudi participation (section 5.1.1, pages 50-51). Its rows cover commercial activity, communications, professional activity, engineering consulting, legal activity and recruitment. We found no row for industrial or manufacturing activity. So the guide gives no ownership percentage and no minimum capital for a factory. Our text extraction of that table can misalign columns, so check the table itself.

That matters because many consultancy pages quote a figure. Some say SAR 25,000, some SAR 1 million, some “nominal”. We found no official source for any of them. Our guide to minimum capital for a Saudi company shows how the same question gets different answers, and our guide to foreign ownership and Saudi partner requirements covers the ownership side.

On fees, the only official statement we have is that MISA’s fee is set when it approves your registration. No official figure found for the MIMR licence or for MODON application fees.

One myth is worth checking. Consultancy pages say 30 percent of a factory’s output has to be sold in Saudi Arabia. We found no official text for that rule. The only 30 percent we saw in the Investor Guide sits in a different place: it is one of the options listed for fully foreign-owned trading companies, and it concerns manufacturing part of the products they distribute locally (section 5.1.3, page 54). It is not described as a factory rule. Because the extracted table is hard to read, confirm this with MISA (verify).

Customs relief and other incentives

MIMR lists a service for a customs exemption on raw materials. It describes small trial quantities in the set-up phase and licensed quantities in production. The page does not state conditions or fees, so we cannot say who qualifies.

A customs exemption on machinery appears only in a search summary of a press release, so treat it as unconfirmed (verify). We found no source for “utility support” or a “levy exemption”. Do not budget for any incentive until you have the conditions in writing.

Documents from your home country

MISA’s Investor Guide asks for the foreign partner’s commercial registration certified by the Saudi Embassy, and the financial statements of the last fiscal year authenticated by the Saudi Embassy (section 5.1.2, page 52). The guide also lists extra papers if the parent company has a different nationality from the applicant.

In our experience, Saudi authorities have accepted both an apostille and Saudi Embassy attestation, and an apostille has been easier and faster. The official guide says Saudi Embassy authentication, so check the route with MISA before you start. See our guide on apostille or Saudi Embassy attestation and the list of documents required for a MISA licence.

Where Apex Arabia fits

We want to be exact about this. Apex Arabia, formed in 2025, has set up one company in the elevator industry among the five companies set up under the Apex name. We cannot tell you, from that one case, how long a Ministry of Industry licence or a MODON allocation takes, and we do not claim factory-licensing experience beyond it. Our wider team has worked on industrial companies at other firms, which is the team’s experience and not Apex’s own count.

Apex offers special licences, including an industrial licence and a baladiya (municipal) licence, as a service after registration. We follow the official pages for who issues what, and where they are silent we say so.

Our recent clients’ experience is that the investment approval step took about two weeks and that registration took 45 to 60 working days to the Commercial Registration. That covers company registration only, it is not a promise, and it says nothing about the industrial licence or land. Our post-incorporation checklist shows what follows registration.

What to confirm before you commit to a factory

  1. The exact approvals for your product. Ask MIMR which licence stage applies and whether your activity needs a sector regulator or an environmental permit.
  2. The order of steps. The sequence of MISA registration, Commercial Registration, MIMR licence and land allocation is not shown on any official page we read.
  3. Whether your ownership structure is allowed for your activity. Ask MISA in writing, since the Investor Guide gives no industrial row.
  4. Land terms from MODON itself. Ask for lease length, rent and payment terms in writing.
  5. Customs relief. Ask MIMR for the written conditions on raw materials and machinery.
  6. Your home-country side. Funding the investment, reporting it and bringing profit back need your own adviser. Indian readers can start with our guide to overseas investment rules for an Indian company with a Saudi subsidiary.

Frequently asked questions

Who issues the industrial licence in Saudi Arabia?

On the official page we read, the Ministry of Industry and Mineral Resources issues it. MISA handles the investor’s registration, and MODON handles industrial land. Some consultancy pages say MISA or MODON issues the licence, which does not match that page. We could not read MODON’s own site, so ask MIMR to confirm the issuing body for your activity before you pay anyone.

Does the industrial licence let me start production?

No, according to the MIMR page. It says the licence is valid for one year and does not entitle the owner to start production. Other approvals and later licence stages are needed. MIMR lists separate renewal services for the establishment and construction stages. Ask MIMR which stage you are in and what unlocks production, because we could not read the requirements tabs.

Do I need MODON land to open a factory?

We could not confirm it. The MIMR page describes MODON land and ready factories as an option for industrial projects. We saw a reference to industrial licences covering sites outside MODON cities, but no list of approved locations (verify). Ask MIMR which sites are allowed for your activity, and ask MODON for its eligibility rules in writing.

Can a foreign company own a factory outright?

We could not confirm it. MISA’s Investor Guide table of activity types has no row for industrial activity, so it gives no ownership percentage for manufacturing. Consultancy pages say full foreign ownership is allowed in most manufacturing, but none is official (verify). Ask MISA in writing about your exact activity, and have a Saudi-qualified lawyer check the answer.

How long does it take to set up a factory?

No official figure found for the whole project. MIMR’s pages show 30 to 90 days on one page and 48 hours on another for the licence alone. Apex Arabia’s recent clients saw about two weeks for MISA’s approval step and 45 to 60 working days to the Commercial Registration. These are our experience for company registration only, not a promise, and they exclude land and construction.

Next step

If you plan a factory, write down your product, your activity code and your ownership structure, then bring them to a call. We can walk through the questions to put to MISA and MIMR, and we can help with registration and special licences after it. Talk to our experts. See also our licensing types page.

This guide is for general information and is not legal or tax advice. Requirements vary by activity and can change; confirm current rules with MISA, the Ministry of Industry and Mineral Resources, MODON or a Saudi-qualified lawyer, or speak to our team. We do not promise approval of any registration or licence.

Updated: 21 November 2026. Reviewed by: the Apex Arabia team.

Sources: MIMR, Issuance of Industrial License (read 21 November 2026); MIMR, (MODON) Industrial Site Allocation (read 21 November 2026); Ministry of Industry portal, new industrial licence service (read 14 October 2026); MIMR services (read 14 October 2026); MISA Investor Guide, 13th edition, March 2026 (text read 21 November 2026); MISA frequently asked questions (read 14 October 2026). Items marked (verify) come from search summaries of government pages we could not open, or from consultancy pages, and are not confirmed.

Written by Apex Arabia team. Published 19 November 2026; last updated 21 November 2026.

Ready To Start You Journey?

Our expert team handles the entire licensing process, from application to final approval.